Trail building, 14th January


  Trail building, 14th January 
  Originally uploaded by bent udder.

Jon, in the grey and black Race Face jacket, is standing on the new line here.

Lots of lovely sunshine yesterday. You can see how we moved the trail bed about two or three feet down the hilside, improving flow. The line now falls down the hill, making a wider (and therefore faster) corner.

 

 
 

Trail building, 14th January 
  Originally uploaded by bent udder.


  Trail building, 14th January 
  Originally uploaded by bent udder.

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/t/trackback/1031923/7501825

Listed below are links to weblogs that reference Trail building, 14th January:

Comments

Me and my son loved doing our bit, we're looking forward to the next time. He's made up that he's famous now too ; )

Post a comment

If you have a TypeKey or TypePad account, please Sign In

My Photo

BKB - the closed bits

  • Lower part of trail blocked
    Here's some pics showing BKB - and the closed parts of the trail. Hurtwood Control have basically taken action because of the disruption the old end of the trail caused to the next door neighours, who were getting a little tired of hearing 'CLEAR!' yelled outside their bedroom window from 7am on Saturday and Sunday mornings. They were very nice about it, by the way, and are real supporters of Hurtwood. The bonus? we get to put in lots of new bits of trail, and increase the length of BKB by a high margin in the process.

Dorking West

  • Pict0186
    The new pump track at Dorking West is pretty much there - it just needs a little bit of shaping and cleaning, and it's good to go. props to oli at Head for the Hills for all the work in the background recently.

May 2008

Sun Mon Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31